Preparetion before installation and electrical fault repair
Preparation Before Installation

SGW12D-1

SGW12D-2
Minimal site layout :

Best site layout :

Electrical preparation:
(1) Four core copper cable>=3x10+6mm2.
(2) Voltage at 380 ± 5%.
(3) The leakage switch rated current can not be less than 60A.
Electrical fault repair
1. Large length error three kinds of solutions.
(1)Close the encoder

(2) Check the belt and rubber tube for looseness.
(3) Replace encoder.

2. Can't return to origin:


(1).The origin position is controlled by the sensor position, checking the sensor is good or bad

(2) The role of three sensors
3. Insufficient air pressure:

(1)Check the direction of motor rotation

(2)Open the valve and drain water
4. Screen cannot be opened:

(1)Check 24v switching power supply led light is on,The led light is off, please check the input power, if the power is normal, please replace the switch power supply.

(2) Check the wire is not off

(3) Check the screen voltage