GUTE Machinery Assists China Railway Fifth Engineering Bureau in Building Gui’an High-speed Intelligent Centralized Distribution Center

Oct 25, 2023|

GUTE Machinery assists China Railway Fifth Engineering Bureau in building Gui’an high-speed intelligent centralized distribution center

 

Project Description

 

The Guiyang-Anshun Expressway starts from the Guanshan Lake Interchange in Guanshanhu District, Guiyang City, connects to the completed Guiyang City Ring Expressway and the urban road Guanshan West Road, and passes through Baihua Lake, Zhanjie, Leping, Caiguan, and Jiaozishan , Baiyan, and ends at the Twelve Camp Interchange in Puding County, Anshun City, where it connects to the planned expansion project of the Shanghai-Kunming National Expressway from Anshun to Panzhou (Guizhou-Dianborder) section. The entire line is approximately 94.1 kilometers long.

 

 

The steel bar intelligent production center built by Chengdu GUTE Machinery and China Railway No. 5 Bureau mainly uses intelligent equipment and intelligent transfer equipment for linked production, greatly reducing manual links.

Steel processing plant

 

solution

 

layout

 

Basic conditions: The processing plant is divided into two-span production workshops (1# steel cage processing, 2# platform, tie beam, cover beam steel bar processing); 1# workshop opens the door on the center column, 2# workshop opens the door in the middle; dedicated transportation channel , Pedestrian safety passage, suspended observation passage (a total of 2 meters of observation passage on both sides of the central pillar of the factory building, safe and good visual)

Steel cage processing
1. The workshop is equipped with a four-wire sawing and wire-threading production line, which can be operated by one person; it is also equipped with a set of China's first fully automatic steel cage welding workstation, which integrates automatic feeding of main bars, automatic alignment of misaligned ends, automatic distribution, and automatic feeding. , automatic welding, automatic welding of ribs, and automatic cage release. The entire production line only needs 1-2 people to operate. Compared with traditional processing methods: save labor, reduce labor intensity, and improve production efficiency; servo computer control The distribution position of the main bars ensures the docking accuracy of the steel cage. The computer memorizes the distribution data of the main bars and can call them at any time.

steel cage

Processing of steel bars for platform caps, tie beams and cover beams
2. The workshop is equipped with a shearing linkage bending center production line to cut, transmit and bend various materials that need to be bent; it is equipped with a fully automatic hoop bending machine, which only requires one person for processing stirrups and hook bars below 12mm. Operation: Equipped with 1 set of automatic welding robots for cover beam skeleton sheets (double robots improve efficiency), only 2 people can operate, dual-station welding platform, left and right alternate work;

news-385-237

Informatization
All equipment has information access ports to facilitate connection with information management systems. 

 

 

contact us

 

...............................................................................

Tel: +8613281163201

WhatsApp: +8613281163201

Email:sales6@cdgute.com

..............................................................................

https://www.gutemachinery.com

 

Send Inquiry