GUTE Machinery Assists Shudao Group To Build A Smart Steel Bar Assembly Center For The Yilong Third Bridge Project
Dec 01, 2022| GUTE Machinery assists Shudao Group to build a smart steel bar assembly center for the Yilong Third Bridge Project

The Nanchong Yilong Jialing River Third Bridge, constructed by Sichuan Road and Bridge Group, is a river-crossing bridge with a total investment of more than ¥700 million. The scale and heritage of this bridge can rival the Jialing River Bridge in Xiazhongba, Nanchong City. It adopts a six-lane model , It can greatly alleviate the congestion problem caused by the traffic flow in the south after the influx of a large number of tourists every year during the holidays in the south.
Daily output 26-52 tons
Total output 13,000 tons
Plant base 2800㎡
Intelligent production
Project Construction Planning:
Conduct on-site visits and surveys according to the proposed project, and combine the company's production management process, staffing and status, production process, product requirements, planned production capacity and many other requirements, from the overall plant planning and construction, power layout, equipment customization and configuration to on-site Equipment placement, production process flow, storage and transfer of materials and finished products form an overall practical and efficient overall plan, and truly realize efficient and practical tailor-made solutions.
Information customization:
All smart devices in the project are added to the gateway, and the interaction between the device and the cloud is realized on the basis of the intelligence of the device itself. By reserving an interface on the intelligent equipment to connect to the information platform, information functions such as remote monitoring, intelligent production scheduling, and equipment early warning can be realized
Intelligent equipment customization:
In the initial stage of bridge construction, the amount of steel bars used in bridge piers is extremely large. As the foundation of bridge pile foundations, steel cages are in great demand and require extremely high quality. In order to meet the requirements of steel cage assembly line processing and tight schedule and large tasks, Gute Machinery customized GHZ25-12 automatic steel welding workstation to upgrade the production method of steel cage, linking the production of steel raw materials to steel cage forming and other steps to realize integrated assembly line processing.

Reinforcement cage one-key forming is achieved through the process of rebar sawing-threading-transfer-reinforcement cage main reinforcement-welding-forming-cage removal and other processes

Personalized service guarantee:
In order to ensure the normal progress of the project, at the beginning of the project, the marketing center led the establishment of the "Yilong Project Service Guarantee Team" composed of key personnel from the sales, customer service, machinery, electrical, information and other sectors. Professionals are one-on-one Direct docking has formed an emergency support mechanism of "accurately grasping the on-site situation at the first time, determining the solution at the first time, and implementing it at the first time".